THE HASKELL COMPANY
HELPING CLIENTS' PLANS TAKE FLIGHT
SINCE 1965
WHY HASKELL?
ABOUT HASKELL
DELIVERY SOLUTIONS
We leave nothing to chance.
PEOPLE
SAFETY
QUALITY
TECHNOLOGY
SUSTAINABILITY
SELF-PERFORMANCE
PROJECTS
COVER
TABLE OF CONTENTS
CONTACT US
FOUNDED IN:
EMPLOYEE-OWNED
REPEAT BUSINESS
BILLION
IN ANNUAL REVENUE
EMPLOYEES
LEED CERTIFIED PROJECTS
OVER
IN-HOUSE DESIGN PROFESSIONALS
PROACTIVE
CULTURE
Founded in 1965 as a design-build company, Haskell is a single-source provider of design and construction services. Haskell has successfully completed over 2,500 design-build and 4,000 construction manager at-risk projects totaling over $13 billion. Our commitment to value and quality has translated into an 80% repeat client base with annual sales over $1 billion.
Haskell is a client-focused, fully integrated service provider.
EXECUTIVE LEADERSHIP TEAM
GLOBAL PRESENCE
SOLUTIONS
LEARN MORE
PROJECT HARNEY
PROJECT BESSIE
HASKELL HEADQUARTERS
JACKSONVILLE, FL
TEMPLE TERRACE, FL
BLUE ORIGIN
CAPE CANAVERAL, FL
HASKELL IN THE UNITED STATES
WE SERVE OUR CLIENTS VIA MULTIPLE DELIVERY METHODS.
DESIGN-BUILD
ENGINEERING, PROCUREMENT + CONSTRUCTION (EPC)
DESIGN SERVICES
PROGRAM MANAGEMENT
CONSTRUCTION MANAGEMENT AT-RISK (CMAR)
Haskell serves as the client’s representative for contractors, subcontractors, vendors and suppliers Scope and expectations are clearly defined by the client We provide detail management in all aspects of the project from scheduling to equipment and integration Haskell focuses on critical areas for benchmarks, budgets, relationships and verification
Haskell assumes single point of responsibility Reduced project risk for the client We will ultimately deliver a turnkey facility that is ready for production Our integrated design, procurement and construction teams can meet fast-paced schedules EPC is best suited for complex infrastructure projects with target production outputs
Haskell works with our client to create detailed drawings and designs Client benefits from market competition for individual resources and contractors Client has more control and oversight of the design and selection of execution partners Staged gate process provides opportunity for client to validate project viability Allows us to build a relationship with our client throughout the critical early project stages
Haskell assumes the role of an owner advocate, managing the project with the owner’s objectives and best interests as priority Provides higher level of cost control for the owner Client has limited risk with a guaranteed maximum price (GMP) contract Client has more control over construction and design
Haskell assumes single point of responsibility Simultaneous execution of Shortest delivery schedule Ability to outline a budget and guarantee cost early using Guaranteed Maximum Price (GMP) contract Integrated design, construction, and system integrations lowers costs Design and construction team collaboration helps quickly mitigate challenges
Haskell assumes single point of responsibility Simultaneous execution of shortest delivery schedule Ability to outline a budget and guarantee cost early using Guaranteed maximum price (GMP) contract Integrated design, construction and system integrations lowers costs Design and construction team collaboration helps quickly mitigate challenges
PROJECT DELIVERY SOLUTIONS
Haskell Client Experience
THE ULTIMATE OBJECTIVE IS TO DELIVER SIX MAJOR BENEFITS.
OUR STRENGTH IS OUR PEOPLE
Ranked among national leaders in the construction industry for safety performance.
Safety is a key measurement of project success; we manage overall project safety, not just our own craftsmen.
KEY TO SUCCESS
We utilize the latest technology to advance safety participation and develop KPIs.
SAFETY INNOVATIONS
TEAM EFFORT
Every field employee is empowered to actively promote safe practices across the organization.
INDUSTRY LEADERS
Consistently ranked among national leaders in the construction industry for safety performance. Safety performance is a key measurement of project success; we manage overall project safety, not just our own craftsmen. The Safety team utilizes the latest technology to advance safety participation and development of KPIs. Every field employee is empowered to actively promote safe practices across the organization.
PROACTIVE SAFETY CULTURE
The Accredited Quality Contractor Program (AQC) publicly recognizes and honors construction firms which have documented their commitment to quality in six key areas of corporate responsibility, including quality, safety, management education, craft training, employee benefits and community relations.
Haskell is an Accredited Quality Contractor, as recognized by Associated Builders and Contractors.
Quality Program focused on assuring predictable outcomes We implement project-specific Quality Implementation Plans (QIP) We get it right the first time!
3D Modeling
BIM Coordination
DESIGN & CONSTRUCTION TECHNOLOGIES
Through our Dysruptek innovation platform, we identify and deploy cutting-edge technologies that add value throughout your project lifecycle: Enable better client visualization and input Increase quality and safety during construction Provide higher-fidelity as-builts to support operations & maintenance
LEED Accredited Professionals on Staff
Leed certified projects pending
NAVFAC MV-22 HANGAR
CAMP LEJEUNE, NC
CONCRETE FABRICATION
PROJECT SUPPLY + EQUIPMENT SERVICES
STEEL FABRICATION
Foundations for buildings + equipment Slabs-on-grade and elevated slabs Tilt-up panels and retaining walls Paving for access roads and parking
Heavy steel sub-assemblies including structural steel beams, columns, stairs + railings (6,500 TPY) Custom products can be fabricated if needed
Frequently-used materials + items are stocked for projects Some construction equipment can be owned/rented and maintained for specific projects
CONCRETE CONSTRUCTION
SELF-PERFORM CAPABILITIES
P1
P2
P3
AVIATION & AEROSPACE KEY CLIENTS
Tampa International Airport
Baltimore-Washington International Thurgood Marshall Airport
Brunswick Golden Isles Airport
AIRPORT PORTFOLIO
MARKET PORTFOLIO
PROJECT EXPERIENCE
Market Portfolio
MANUFACTURING & ASSEMBLY
PAINTING & COATING
CARGO HANDLING
MRO
FBO
TERMINAL
SCIF
FLIGHT SIMULATOR TRAINING
MP
SERVICES
Complete A/E Construction Project Management Site Selection Master Planning Foundations, Footings and Slab-on-Grade Concrete Tilt-Wall Panel Fabrication and Erection Structural Steel Fabrication
SIZE
1,250,000 SF
139 acres of total development, including 54 acres of wetland creation and enhancements Facilities include manufacturing, warehouse, labs, surface coating and testing Specialty shops, open high-bay assembly space and office support areas Includes 16,400 SF of Clean Rooms (Class 100,000, ISO8)
DURATION
10 Months
MANUFACTURING & ASSEMBLY PROJECT
BLUE ORIGIN ORBITAL LAUNCH SYSTEM MANUFACTURING CAMPUS Merritt Island, FL
Complete A/E Construction Project Management Foundations, Footings and Slab-on-Grade Concrete Tilt-Up Wall Panels Fabrication and Erection Structural Steel Fabrication
210,000 SF
ROLLS-ROYCE CROSSPOINTE ROTATIVES FACILITY | Prince George, VA
Manufactures precision jet aircraft engine components Includes rooms and spaces for milling, grinding, tooling, finishing, polishing, testing, inspecting and measuring the manufactured components
Complete A/E Construction Project Management Industrial Process Engineering Services Foundations, Footings and Slab-on-Grade Structural Steel Fabrication
344,000 SF
SAFRAN AEROSPACE COMPOSITE PARTS MANUFACTURING FACILITY | Rochester, NH
Composite aircraft parts manufacturing facility Class 100,000 (ISO8) clean rooms Two fan blade lines and one fan case line -10°F raw materials freezer Specialized pits and foundations for tomographs, milling machines, CMM and autoclaves Environmentally-controlled areas for weaving, injection, water jet, tool cleaning, lab, CMM and bonding operations
Complete A/E Construction Project Management
625,200 SF
SPIRIT AEROSYSTEMS MANUFACTURING | Kinston, NC
Building’s footprint includes two manufacturing clean rooms totaling 170,000 SF and kept clean and cool by over 3,000 tons of chillers, cooling towers and humidification systems 23 KV main sanitation distributed to six remote 480V substations 1,000 KVA emergency generator Composites manufacturing process equipment foundations design and installation
244,000 SF
SPIRIT AEROSYSTEMS COMPOSITES COMPONENT MANUFACTURING | Malaysia
Southeast Asia manufacturing hub for Spirit AeroSystems Work cells are on raised floor with all utilities routed below Level 1 supplier for Airbus National Project of the Year by Malaysian Industrial Development Board (MIDA) State-of-the-art finished product paint plant Cranes, automated paint booths room, boilers, chilled water systems, dust extractor systems
Complete A/E Construction Project Management Foundations and Footings Engineering, Procurement and Installation of Chemical Lines
540,000 SF
COLLINS AEROSPACE COMPOSITE BONDING FACILITY | MEXICALI, MX
The original 400,000 SF facility was built to manufacture the thrust reversers for engines on the Boeing 787 Dreamliner 140,000 SF expansion hosts manufacturing and assembly areas for nacelle components for different aircraft engine programs Haskell provided the engineering, procurement and installation of five automated lines, including chemical processing, chemical milling and maskant treatments Separate 21,000 SF central utilities building
92,000 SF
BOEING CHEMICAL PROCESSING FACILITY | Portland, OR
Aircraft parts chemical processing facility Includes a 38,000 SF below-grade pit for chemical processing tanks and equipment, a 9,000 SF two-story office area, 12,000 SF chemical receiving and storage area and 33,000 SF of first floor work space Designed to meet hazardous occupancy code requirements Exterior wall construction includes precast concrete wall panels and fire rated insulated metal panels
Complete A/E Construction Project Management Master Planning
1,525,000 SF (141,677 m2)
GATORADE PROCESS, PACKAGING & DISTRIBUTION FACILITY | Pryor, OK
With green features including solar energy, wastewater conservation and recycled material usage, this facility became the largest, most advanced and energy efficient Gatorade bottling plant in the world 25,000 SF of office space, 300,000 SF of process and packaging systems and 1.2M SF of distribution space. Haskell’s third manufacturing and distribution effort with Gatorade When the Pryor facility was awarded LEED® Gold Certification, it became the largest food & beverage facility in the world to receive that designation
RELEVANT PROJECT
Complete A/E Construction Project Management Steel Fabrication Tilt-Up Concrete Panels
1,360,875 SF (126,429 m2)
BIG LOTS WAREHOUSE AND DISTRIBUTION FACILITY | Apple Valley, CA
Facility was compromised of full-height, self-performed, tilt-up concrete panels as well as steel columns, joists, and girders Roof decking made from oriented strand board for its seismic advantages Cantilevered, full-height, tilt-up, three-hour separation wall bisects the building’s center to provide additional fire protection Environmentally friendly features like occupancy-sensor lighting earned this project a LEED v3.0 Certification Haskell has completed four projects with Big Lots totaling over 7M SF in facility space
Complete A/E Construction Project Management Self-Performed Concrete Work and 3,300 Tons of Steel
1,100,000 SF (102,193 m2)
NIKE US FOOTWEAR DISTRIBUTION CENTER | Memphis, TN
Greenfield facility consolidates existing distribution centers in OR and TN into one 125-acre site Conventionally framed structural steel building 8-inch industrial floor slab and exterior load bearing tilt panels 3,000 SF of office space attached to the warehouse that features a full-service cafeteria, fitness center and basketball court Building includes white TPO membrane roof with soalr tracking skylights and T5HO fluorescent lighting fixtures with occupancy sensors Concrete tilt-up walls meet maximum forseeable loss criteria for a high seismic design zone
Complete A/E Construction Project Management Concrete & Steel Fabrication
930,000 SF (86,399 m2)
GATORADE WAREHOUSE, PROCESSING & PACKAGING FACILITY | Wytheville, VA
World’s largest LEED 2.1 Gold food and beverage facility 24,000 SF of offices 250,000 SF of process and packaging 656,000 SF warehouse Also included in the slab-on-grade project was an on-site rail shed, guardhouse and wastewater treatment plant The project included the installation of solar voltaic panels on the roof to generate some of the facility’s energy needs
375,000 SF (34,838 m2)
ALLIED ELECTRONICS OFFICE & DISTRIBUTION CENTER | Fort Worth, TX
375,000 SF tilt-up office and distribution center 75,000 SF office Warehouse consisting of 150,000 SF 5-high pallet racking area and 150,000 SF full mezzanine for small parts
Complete A/E Construction Project Management Structural Steel Fabrication Tilt-Up Wall Construction
259,000 SF (124,061 m2)
MERILLAT INDUSTRIES, INC. MANUFACTURING FACILITY | Ocala, FL
240,000 SF vertically integrated assembly (VIA) manufacturing plant 19,000 SF office space Facility includes finishing, milling and assembly operations This facility is a prototype for the remaining Merillat manufacturing plants
Complete A/E Construction Project Management Steel Fabrication
95,000 SF (8,825 m2)
ENKEI AMERICA, INC. MANUFACTURING FACILITY | Jacksonville, FL
Enkei’s third manufacturing facility in the U.S. and ninth worldwide First phase is a 30,000 SF warehouse and second phase is a 35,000 SF manufacturing plant Manufacturing facility features a casting line and two machining lines, a quality control lab and a mold maintenance shop An explosion-proof paint storage room was also added to accompany a future painting line Buildings were constructed using site-cast, tilt-up, concrete panels and conventional structural steel
Complete A/E Construction Project Management Structural & Miscellaneous Steel Fabrication Self-Performed Concrete Foundations, Tilt Panels and Slab-on-Grade
109,000 SF
GULFSTREAM AEROSPACE MRO SERVICE CENTER | Brunswick, GA
Haskell’s fifth service center for Gulfstream Business jet service center Hangar, shop areas, offices, aircraft aprons and taxiways Conventional steel frame, interior hangar 41’ clear height; 150’ clear-span; hangar door 28’ clear height opening Perimeter concrete tilt panel and insulated metal panel wall systems High expansion foam fire protection system Aircraft defueling system
MRO PROJECT
Complete A/E Construction Project Management Conventional Steel Building
85,000 SF
UNITED AIRLINES MRO HANGAR | Tampa International Airport, FL
Additional 17,000 SF of concrete apron and parking lot Designed for Boeing 737 Fire water storage tanks (270,000 gallons) Pumps, detention/retention ponds (72,000 gallons) Oil/water separators
Complete A/E Construction Project Management Paving and Site Improvements
103,000 SF
NAVFAC P-464 F-35 AIRCRAFT MAINTENANCE HANGAR | MCAS Beaufort, SC
103,000 SF aircraft maintenance hangar 4,000 SF Pilot Fit Facility 7,700 SF Operational Support Facility 260-space parking structure New hangar will accommodate nine F-35B aircraft, crew and equipment space, admin space and more Paving and site improvements (taxiway, roadways, security fencing, fueling stations, surface parking) Extension of aircraft parking apron Restriping and modification of existing aircraft concrete parking ramp
174,000 SF
GE AIRCRAFT ENGINES MAINTENANCE HANGAR | Victorville, CA
Hangar, shop, and office facility serve as a home for GEAE’s Flight Test Operation flying test bed, a Boeing 747 aircraft used for in-flight engine testing 80,000 SF hangar area has stepped framing with 86’ and 55’ clear height with a pocket tail door Hybrid pre-engineered metal building provides hangar clear dimensions of 265’ wide by 303’ deep with an 87’ clear height at the tail section
Complete A/E, including design of the downdraft paint bay mechanical system Construction Project Management Foundations Tilt-Up Wall Panels Fabrication & Erection
215,000 SF
LUFTHANSA TECHNIK FIVE-BAY HEAVY MRO FACILITY | Aguadilla, PR
14.57 acres of site development Includes one downdraft paint bay and four maintenance bays for Airbus A-321 aircraft Support shops include composite, sanding, paint, MEK, interiors, welding & riveting, sheet metal, heat treatments and tool crib 14,281 SF second floor office facility overlooking hangar Conventional steel frame 69’-8” high structure with full overhead crane coverage and hanging tail docks Designed around sustainable building concepts including natural daylighting in the hangar
Complete A/E Construction Project Management Foundations and Footings Structural Steel Fabrication
105,000 SF
COLLINS AEROSPACE AIRCRAFT ENGINE NACELLES MRO FACILITY | Foley, AL
90,000 SF of manufacturing areas 15,000 SF of office space 2018 ABC First Coast’s Excellence in Construction Award
60,000 SF
AFCO GROUND SUPPORT EQUIPMENT MAINTENANCE FACILITY | Orlando, FL
Design-build GSE maintenance facility 60,000 SF multi-tenant shop space 74,000 SF airside storage apron Exterior truck loading dock and ramp with dock leveler board 400 SF of finished office and restroom space Mechanical, electrical and equipment necessary to support the facility
263,000 SF
NAVFAC MV-22 HANGAR | Camp Lejeune, NC
Modified Type II aircraft maintenance hangars to provide hangar bay, shop space, flight line operations space, two aircraft wash racks and maintenance functions Built-in hangar equipment includes an elevator and two 7-ton bridge cranes with 42’ hook height 1,254 space multi-level precast concrete parking garage with access ramps and pile supported reinforced concrete foundations 66,000 SF asphalt parallel taxiway 1,825,000 SF concrete parking apron expansion Designed to achieve LEED Silver Certification Hangar is the largest Marine Corps building in the world
Complete A/E Construction Project Management Deep Pile Foundations Design
44,000 SF
MAAS AVIATION TWO-BAY PAINT HANGAR | Mobile Aeroplex at Brookley, AL
Complete design-build services for two-bay cross-draft paint hangar for unfueled aircraft Facility designed to accommodate Boeing 757 and Airbus A320 series aircraft
PAINTING & COATING PROJECT
Complete A/E Construction Project Management Concrete Tilt-Wall Panels Fabrication and Erection
102,000 SF
GULFSTREAM AEROSPACE PAINT HANGAR | Savannah, GA
State-of-the-art painting and coating facility One cross-draft prep booth, two downdraft paint booths, offices, shops, storage and employee amenities Conventional structural steel framing at paint booths with 35’ ceilings and 51’ roof framing, load-bearing tilt-up wall panels and conventional steel roof framing A.F.F.F. foam fire protection system at paint booths NFPA AOG compliant
45,000 SF
JET AVIATION FIXED-BASE OPERATION FACILITY & OFFICES | Teterboro Airport, NJ
Designed and built a five-story, general aviation, fixed-base operation facility First two floors accommodate separate pilot and passenger lounges, business offices, food service area, weather station, car rental office and private offices Upper floors contain Jet Aviation’s headquarters’ offices, conference rooms and an exercise room Permitting process completed by Haskell required coordination with NY/NJ Turnpike Authority and various state agencies
FBO PROJECT
SIGNATURE FLIGHT SUPPORT W-1H HANGAR | Teterboro Airport, NJ
Two 30,000 SF airport hangars 177’ wide hangar doors Attached maintenance shop Two-story 13,000 SF FBO terminal Leasable tenant office spaces
Complete A/E Construction Project Management Concrete Tilt-Up Panel Construction
130,000 SF
GREENVILLE-SPARTANBURG AIRPORT AIR CARGO FACILITY | Greer, SC
110,000 SF air cargo facility with approximately 12,000 SF of office space Warehouse and office space split in half for two tenants Truck dock parking and employee car parking 21 truck docks, an interior drive-in ramp, an exterior drive-in ramp, and multiple scissor lift locations Can accommodate three Boeing 747- 800 freighter aircraft simultaneously Overhead crane capabilities with lift capacity up to 20 tons Cryo Farm which can be used to cool specialized healthcare equipment
CARGO HANDLING PROJECT
Complete A/E Construction Project Management Self-Perform Cast-in-Place Concrete: Foundations, Tilt Panels, Dock Pits, Trench Drain
200,000 SF
AFCO AIR CARGO FACILITY | BWI Airport, MD
450,000 SF airfield concrete apron 1670 LF of airfield rated trench drain 6 aircraft parking stalls 53 dock pits and dock levelers, 100 truck overhead doors, 15 large high speed fabric doors on the airside Facility system designed into four quadrants for future tenant flexibility
Complete A/E
TULSA INTERNATIONAL AIRPORT RENOVATION AND EXPANSION | Tulsa, OK
92,000 SF of space added with state-of-the-art baggage conveyor and bomb detection system Renovation consisted of facility modernization, technology upgrades and aesthetic improvements Portions of existing roofs raised to allow natural lighting inside facility Complete redesign of the CCTV head end monitoring and recording system for 168 cameras Remodel and upgrade of dispatch control room
TERMINAL PROJECT
Haskell professionals have completed design and/or construction management on 25-plus Sensitive Compartmented Information Facilities (SCIFs). Past clients include both federal agencies and private-sector defense firms. Haskell understands SCIF requirements for an accreditation-ready facility to serve our clients’ sensitive missions.
Haskell’s vision to Create Things That Matter takes shape when delivering SCIFs that support our national security!
SCIF PORTFOLIO
ICD/ICS-705 v.1.4: Technical specifications for construction and management of SCIFs International Traffic in Arms Regulations (ITAR) requirements for US companies, citizens and persons as architect/engineer/construction contractor JAFAN Manual 6/9: Joint Air Force, Army, Navy Manual for Physical Security Standards for Special Access Program Facilities (SAPF)
Haskell understands the value of early stakeholder involvement to focus on client requirements: Accrediting official Site security manager Certified TEMPEST Technical Authority Mission users
Complete A/E Construction Project Management Space Planning and Programming/Project Scoping Studies/Investigations/Evaluations Topographic Survey Services Soil Borings, Geotechnical Report
Building 7015: 101,580 SF Building 7025: 114,778 SF Building 7000: 161,215 SF
AIR FORCE CIVIL ENGINEER CENTER JOINT SPACE OPERATIONS CENTER CONSOLIDATION | Vandenberg AFB, CA
Renovations of three buildings Demolition, construction of hard-wall offices, training rooms, and conference rooms New fire protection system Communications and security system
SCIF PROJECT
Complete A/E Project Management Space Planning and Programming Topographic Survey and Geotechnical Report
127,000 SF
US AIR FORCE SPACE INNOVATION & DEVELOPMENT CENTER | Schriever AFB, CO
USACE-managed contract Technology-intensive simulation center that supports research in advanced space technologies SCIF computer simulation & operations centers Special Access Program Facility Highly reliable, redundant utility systems Classified and unclassified networks (TEMPEST / 2-95) 14 STC-50 rated conference rooms 10 SCIF rated conference rooms
52,000 SF
NATIONAL SECURITY SPACE INSTITUTE | Peterson AFB, CO
USACE-managed contract The focal point for space training and education and provides world-class instruction of space systems, capabilities, requirements and strategies to support National Security Classrooms, research areas, offices, special purpose spaces, computer rooms SCIF areas Distance learning multi-media room Web studio
300,000 SF
NAVFAC P500 LITTORAL COMBAT SHIP TRAINING FACILITY | Naval Base San Diego, CA
Designed multiple SCIF areas in compliance with ICD/ICS 705 Three virtual reality (VR) bridge trainers equipped with 180-degree view projection 14 student VR laboratories Data center, offices, support space and administrative space 41,000 SF high bay space of full scale mockup of mission bay on the ship that affords mission specialists hands-on training on exact replicas of specialized equipment
FLIGHT SIMULATOR TRAINING FACILITY EXPERIENCE
CLIENT EXPERIENCES
“Having a design-build firm like Haskell makes a construction project easier to accomplish, the relationship is a partnership not an adversary.” - Paul Sackos, PE, Associate Director of Facilities, Owner’s Representative, Collins Aerospace “Haskell’s strong safety record and flexibility to work with us collaboratively through various changes were key to the project’s success. The completed project is a jewel in the Rolls-Royce crown.” - Lorin Sodell, Plant Manager, Rolls-Royce North America, Inc. “The Haskell team utilitized their exceptional design and construction expertise to mitigate issues and deliver our manufacturing facility within both agreed time frame and contractual budget... this project has been a visible success inside the Safran Group.” - Michael Rigalle, VP/GM, Safran Aerospace Composites "Haskell has been very flexible accommodating design revisions to support maturing production requirements. I would strongly recommend Haskell to my colleagues and others executing similar projects." - Scott Henderson, Orbital Launch Site Manager, Blue Origin
JASON KIRK Director of Business Development 904.791.4605 Jason.Kirk@Haskell.com
GREG AKERS Division Leader - Aviation & Aerospace Manufacturing 904.791.4686 Gregory.Akers@Haskell.com
111 Riverside Avenue Jacksonville, FL 32202 904.791.4500 www.haskell.com Jacksonville, FL (Global Headquarters) | Atlanta, GA | Beloit, W| Charlotte, NC | Dallas, TX | Irvine, CA | Livermore, CA | Miami, FL Nashville, TN | Oklahoma City, OK | Salt Lake City, UT | San Diego, CA St. Louis, MO | St. Paul, MN | St. Petersburg, FL | Tulsa, OK México | China | Malaysia | Philippines | Singapore
www.haskell.com
PAUL RAUDENBUSH SVP - Planning & Development 904.791.4655 Paul.Raudenbush@Haskell.com
HASKELL U.S. PRESENCE
BLUE ORIGIN / CAPE CANAVERAL, FL
BACK
DISTRIBUTION FACILITY / APPLE VALLEY, CA
BEVERAGE PRODUCTION FACILITY / HOUSTON, TX
PROJECT TEAM ROSTER
DESIGN
CONSTRUCTION
CLOSE-OUT
ABOUT /
HASKELL
It is mandatory for every Haskell project to develop, maintain, and execute a Quality Implementation Program (QIP).
QUALITY PLAN
Our QIP is focused on assuring predictable quality outcomes by capturing the activities needed to ensure a quality project and satisfied client.
CLIENT SATISFACTION
The QIP defines consistent applications, clarifies responsibilities, promotes improvement, limits rework and achieves your project requirements.
QIP GOALS
From design documents to construction, the QIP is managed by a corporate quality assurance coordinator and communicated to the project team on a regular basis.
HIGH PRIORITY
DELIVERY METHODS /
OVERVIEW
PROJECT EXECUTION MODEL
Deliver detailed documentation of the assets Secure the external resources required to deliver assets Construct, fabricate, buy, and install the assets
EXECUTE THE PLAN
Prove what was built conforms to the design Prepare the client’s team for hand-off Prove the design conforms to the business plan
DEMONSTRATE COMPLETION
Formally transfer ownership Gather data for future use Perform client follow-up
Identify opportunity or need Develop + evaluate options Create the business plan
CREATE THE PLAN
Formally transfer ownership Gather data for future needs Follow-up
PLANNING
Master Planning Site Analysis Due Diligence LEED Furnishings Selection
Master Planning Jurisdictional Determinations
PERMITTING
Civil Structural Mechanical Refrigeration Electrical Landscape Design
ENGINEERING
BIM + CAD Programming Building Design Interior Design + Procurement Facility Condition Assessment
ARCHITECTURE
QUALITY ASSURANCE
Document Review Field Inspection
FACILITY DESIGN
PRECON /
PROCESS FLOW
FUNNEL
ESTIMATING FUNNEL
ROUGH ORDER OF MAGNITUDE
CONCEPTUAL PROJECT PLAN
PRELIMINARY DESIGN
DETAILED DESIGN PLAN
I
PHASE
II
III
IV
Cost accuracy: +50% to -30%
Cost accuracy: +40% to -20%
Cost accuracy: +25% to -15%
Cost accuracy: +10% to -10%
20%
30%
15%
10%
5%
ACTUAL COST
ESTIMATE
BIG LOTS
PROJECT HIGHLIGHTS
1,360,875 SF
PROJECT DURATION
Design-Build Project Delivery Site Evaluation Complete A/E Design Self-Performed Concrete Steel Fabrication
Big Lots contracted Haskell to build a new 1.3M SF warehouse and distribution facility to service the entire West Coast Region. This new, enormous facility was compromised of full-height, self-performed, tilt-up concrete panels as well as steel columns, joists, and girders. In order to overcome some additional location-related challenges, we utilized roof decking made from oriented strand board (OSB) for its seismic advantages. We installed a cantilevered, full-height, tilt-up, three-hour separation wall bisecting the building’s center to provide additional fire protection. Environmentally friendly features like occupancy-sensor lighting earned this project a LEED v3.0 Certification In all, Haskell has completed four projects with Big Lots totaling over 7M SF in facility space
APPLE VALLEY, CALIFORNIA
/
PROJECT PROFILES
17 months
BENTLY HERITAGE
Bently Heritage contracted Haskell to help them convert two historic facilities into high proof, craft distilleries complete with grain handling, process piping, multiple stills, fermenting tanks, and packaging lines. With four independently operating distillation systems, these facilities required a complex process network that included more than seven miles of piping, over 80 vessels, and both traditional and nontraditional aging environments. Our virtual design and construction teams integrated models from all disciplines to ensure the constructability of the building and processing systems prior to installation. This identified hundreds of conflicts that we were able to subsequently mitigate prior to encountering the impacts to time and cost in the field.
EPC Project Delivery Virtual Design and Construction Process Systems Packaging Systems Project Management Startup + Commissioning Facility Construction
MINDEN, NEVADA
24 months
IN-N-OUT
In-N-Out Burger contracted Haskell to design and construct a full-scale facility to house its operations, warehouse, and processing operations so that they could keep up with growing operations and demand in Texas. This project was executed with an Engineering, Procurement and Construction (EPC) delivery method. The new facility included a main building and three support buildings, all built on a fully developed, 20-acre greenfield site. The 126,000 SF main building is highlighted by 27,000 SF of high-end meat production and 4,200 SF of liquid processing which work together to produce fresh product for delivery to nearby stores. The site scope consisted of 118 on-grade concrete auto spaces and tractor trailer parking, concrete paved drive lanes, and loop roadways for fire department access. The stainless industrial facility is juxtaposed by a Spanish themed administration office.
175,000 SF
EPC Project Delivery Complete A/E Design Refrigeration Design + Construction Equipment Procurement + Installation Startup + Commissioning Operator Training
LANCASTER, TEXAS
26 months
ASIA
UNITED STATES
LATIN AMERICA
HASKELL IN LATIN AMERICA
LATAM
Headquartered in México City Tenured Bi-Lingual & Bi-Cultural Staff Full design + construction capabilities Leverage U.S. resources for additional design and construction expertise, best practices, lessons-learned and peer reviews Permanent presence and project experience in Mexico, Colombia, Ecuador, Central America and the Caribbean
Headquartered in Jacksonville, FL 20+ offices located throughout the United States Over 700 in-house design professionals 177 permanent craft employees
HASKELL IN ASIA
Haskell has office locations in Malaysia, Singapore, China, + the Philippines Tenured bilingual + cultural staff Full design + construction capabilites Leverage U.S. resources for additional design + construction expertise, best practices, lessons learned + peer reviews
PROCESS
PROCUREMENT + INSTALLATION
Shutdown / Turnaround Planning Field Project Management Equipment / Vendor Specifications Team Review of Proposals OEM Selection & Procure Equipment Analyze Bidders through one easy to use Matrix
Master Planning 3D Modeling Plant Layout Budget Development FEL 1-3 Feasibility Studies
CONCEPT DESIGN
P + ID's Clean-in-Place Design (CIP) Dust / Fume Collection Design Product Recovery Systems Piping Model Design Control Systems Integration
DETAILED DESIGN
Validate Construction Integrity Mechanical Completion Audits Equipment Troubleshooting Check System Sterility System Checkout System Training
START-UP + COMMISSIONING
PACKAGING
Master Planning Project Estimating Reused Equipment Evaluations Simulations System Assessments Overall Equipment Effectiveness
Optimal Line Layout Packaging Flow Diagrams Packaging Matrices Utilities Matrix Speed Matrices Emulation
Vendor Management Integration Line Sizing LEAN for High Speed Manufacturing System Integrity Analysis System Program Management Installation Project Management
Control Panel FAT Vendor Equipment FAT Installation Support System Checkout + Commissioning Longterm Support Training
SYSTEM ANALYTICS
Audit Scorecard Benchmark Current Systems Identify Inefficiencies Define Steps for Mitigating Challenges Identify Safety Hazards & Risks
SYSTEM AUDITS
System Capacity Analysis CAPEX & OPEX ROI Analysis Warehouse Capacity Analysis Material Flow Analysis Labor Analysis Production Scheduling
MASTER PLANNING
OPTIMIZED MASTER PLANNING
Capacity Optimization Material Flow Optimization Design Optimization Controls Testing Virtual Reality
DIGITAL TWINS: SIMULATION +EMULATION
DIGITAL TWINS & SIMULATIONS
INVENT
Dedicated research + development combined in a world class maker space, we are iterating, patenting, and scaling concepts to reality
We align our clients, employees, and leading research institutions in a partnered ecosystem to innovate openly, co-create and co-invest as we build the future together
INVEST
INNOVATE
INNOVATIONS /
DYSRUPTEK
HOLOBUILDER
GHOST ROBOTICS
The corporate venture arm of Haskell; Dysruptek seeks to make capital investments in early stage, emerging technology companies focused on transforming architecture, engineering and construction